Manwell Power
Menu

Laredo, Texas · Public power across the United States and Canada

Distribution transformers and medium-voltage switchgear for public power.

Pad-mounted and pole-mounted units from established manufacturers, imported and delivered to your specification, with the DOE, IEEE and country-of-origin documentation your purchasing office needs in the package.

75 to 2,500 kVAThree-phase pad-mounted · 15 kV class · 95 kV BIL
10 to 167 kVASingle-phase, pole and pad-mounted · 7200/12470Y V
15 kV · 600 APad-mounted air-insulated switchgear · dead-front
DOE 10 CFR 431IEEE C57.12.00 / .20 / .25 / .34 · ANSI C57.12.28

Vision

To use the power of mankind toward the energy of the globe.

Mission

To bring outstanding energy projects to life.

Today that means one job done carefully: getting qualified transformers and switchgear to the municipal utilities, cooperatives and public power agencies that keep communities running.

Lineworker wearing a Manwell Power hard hat in front of a pole-mounted transformer
CORE VALUES

Reliability, forward thinking and alignment.

Three values, one way of working. They are how we select a manufacturer, write a quote and answer a call.

01

Reliability

Mastering ourselves, understanding the world, and acting with intention.

  • TrustworthySomeone you can rely on.
  • ForthrightOpenly honest, even about difficult things.
  • SincereGenuine in our intentions.
  • Progressive mindsetIngenuity: creative, intelligent problem-solving.
02

Forward Thinking

The liberty to imagine, explore, and express ideas without limitations.

  • Pioneering spiritLeading technological change.
  • GenuineAuthentic and real.
  • AuthenticTrue to ourselves.
  • OpennessWilling to share thoughts and ideas.
  • Intellectual freedomExplore, question, and challenge ideas openly.
03

Alignment

We work as a team.

  • Team alignmentIn agreement on values, goals, and standards.
  • Team accountabilityTaking responsibility for actions and commitments.
  • Team integrityActing ethically and consistently.
  • Intelligent efficiencyAgility: efficiency, speed, and adaptability.
01 — WHAT WE DO

One kind of customer: public power. Done carefully.

Public utilities are buying more distribution transformers than the market is making, and lead times have stretched to a year or more on common sizes. Manwell Power exists to add qualified supply: product built to the standards your material specification already cites, with the submittal package ready on the day we quote.

FOR WHOM

Public buyers

Municipal electric systems, electric cooperatives, river authorities and public power agencies that purchase under competitive procurement, cooperative contracts or annual supply agreements.

FROM WHERE

Established manufacturers

Plants in Mexico and Korea that already build to IEEE C57.12 and DOE efficiency levels. We handle import, customs clearance, inspection and delivery FOB destination in Texas.

WHO ANSWERS

One point of contact

Our supply and bids team prepares every quote and answers for every delivery. Each RFQ keeps a single point of contact from first reply to final invoice.

02 — PRODUCTS

Standard utility ratings. Other ratings on request.

Each product page lists ratings, voltages, BIL, construction and the standards the unit is built and tested to.

03 — COMPLIANCE

The paperwork travels with the unit.

A purchasing officer should not have to chase documents. Every quote and every delivery includes the following.

  • DOE efficiency certificationCertificate of compliance and DOE database listing for each model offered.
  • Per-unit test reportFactory test report per IEEE C57.12.90: ratio, polarity, resistance, no-load and load losses, impedance, applied and induced voltage.
  • Guaranteed lossesNo-load and load losses stated per model so the buyer can run its total-ownership-cost evaluation.
  • Outline and nameplate drawingsDimensional drawing, weights, fluid volume and nameplate data for approval before manufacture.
  • Country-of-origin statementOrigin of the unit and of its core, windings, tank and bushings.
  • Warranty termsStated in each quote and administered in the United States.
Manwell Power nameplate on a pad-mounted transformer
Nameplate data approved before manufacture; test report per IEEE C57.12.90 on every unit.

Standards we work to, in detail

04 — HOW TO BUY

Built for the way public buyers already purchase.

Send ratings, quantities and a delivery point. We reply with price, lead time and the compliance package.

Request for quote

Formal bids, RFQs and informal quotes. Price validity and lead time stated in every response.

Submittal review

Drawings, test data, DOE listing and origin statement go to your engineer before anything is built.

Order and manufacture

Purchase order against the quote. Factory test report per IEEE C57.12.90 on each unit.

Delivery

FOB destination, inspected on arrival in Texas. Net 30 terms for public buyers.

Manwell Power crate in a bonded warehouse in Laredo
Laredo, TexasCustoms clearance, inspection and bonded warehousing on the I-35 corridor. Delivered FOB destination across the United States and into Canada.

Cooperative contracts, annual agreements and terms

05 — QUESTIONS BUYERS ASK

Straight answers before the RFQ.

Short answers here; the buyer guides go deeper on lead times, specifications, DOE efficiency, Buy America and cooperative contracts.

What is the lead time on a pad-mounted transformer right now?

Common single-phase and three-phase ratings are quoting 40 to 90 weeks from most manufacturers in 2026. We state the lead time from the factory slot in every quote and offer stock positions against annual agreements for recurring sizes.

Do you supply outside Texas?

Yes. We are based in Laredo, Texas and quote to municipal utilities, electric cooperatives and public power agencies across the United States and Canada, FOB destination.

Are the units DOE compliant and listed?

Every liquid-immersed distribution transformer we quote, 10 to 2,500 kVA, is certified to DOE 10 CFR 431 Subpart K and listed in the DOE compliance database under its manufacturer. The certificate and listing travel with the quote.

Which manufacturers do you represent?

We select established plants in Mexico and Korea for distribution units, and manufacturers with plants in the United States and Canada for substation and power transformers. The manufacturer of every unit is named in the quote, never substituted without your written equivalency review.

Can you quote substation or power transformers?

Yes: substation units from 2,500 kVA to 30 MVA and power transformers from 10 to 300 MVA, 69 to 345 kV, including GSU and autotransformers, with factory acceptance testing and field service through our service partner.

How do public buyers purchase from you?

Request for quote, formal competitive bid, cooperative purchasing contracts as they are awarded, or an annual supply agreement with stock held against the contract. Net 30 for public buyers; W-9, insurance certificate and vendor forms on request.

Supply & Bids
Quotes, documents and delivery · Manwell Power

A new company, and we say so

What you get from us is focus.

We have not been in business for thirty years. We bring one launch product family, one state, documentation done correctly the first time, and a team that picks up the phone. If a specification calls for a manufacturer we cannot offer, we tell you so in the first reply.

About Manwell PowerCapability statement (PDF)

06 — CONTACT

Send us a list and a date.

Ratings, quantities, delivery location and the date you need the units. We reply within one business day with price, lead time and documents.

Request a quotequotes@manwellpower.com